Flow Regulation
Balance

Location: Cefn Gorwydd

Client: Welsh Water

Completed: 2012

Project Information

 

Background:

Need to accurately control a very low flow rate of waste water without blockages.

Application:

Within a sewer network to limit pass forward flow.

Solution:

Design, manufacture and deliver 1 No balance flow regulator.

Performance:

Successfully managed flow regulation.

Data:

Media:                               Combined

Pass forward flow rate:  2 l/s

Head:                                 N/A

Accuracy:                          +/- 5%

 