Project Information
Background:
Existing storm overflow on the waste water treatment plant required screening to prevent discharge of screenings larger than 6mm in two directions.
Application:
Combined Domestic sewage and rain water.
Solution:
Pump action screen (PAS) retrofitted into existing inlet chamber.
Data:
Spill Flow: 800 l/s
No of Screen: Twin
Screen Length: 5000 mm
Screen Diameter: 300 mm
Screen Perforation: 6 mm
Pump Type/Size: 2 No Flygt 4.7 kW
Products featured in this case study
